Your Cart: £0.00

Spend £100.00 more for free shipping!

View Cart and Checkout
Black FridayUp to 52% offShop now →
H2040TL 2.9G Linear Servo Long Lead: UMX Timber X

Spektrum H2040TL 2.9g Linear Servo Long Lead

Brand: Spektrum

Part No: SPMSH2040TL

£18.99 RRP £19.99

Usually ships same day

UK Delivery
Get it by Tomorrow (Order within 13h 52m)
Store Collection (Cannock)
Today (Order within 15h 47m)

Finance options available at checkout.

Fits These Models (1)

Show all 1 models

Popular with customers who buy products like the H2040TL 2.9G Linear Servo Long Lead: UMX Timber X

Description

The Spektrum H2040TL 2.9g Linear Servo Long Lead (SPMSH2040TL) is a performance long-throw ultra micro servo designed for AS3X ultra micro aircraft. Delivering a 13.5 mm travel in a compact 2.90 g package, it combines precise 0.065 s transit speed (at 4.2 V) with 9.6 oz-in torque, ideal where smooth, accurate control is essential.

A long 115 mm lead with a JST-SHR 1.0 mm connector simplifies installs in tight airframes, while the compact footprint helps keep weight and space to a minimum. The servo features nylon gears, a single bearing, and a brushed motor, and is programmable while remaining an analog type.

Key Features

  • Performance linear long-throw design for AS3X ultra micro aircraft
  • 13.5 mm servo throw with compact footprint
  • Long 115 mm lead with JST-SHR 1.0 mm connector
  • Precise response: 0.065 s speed and 9.6 oz-in torque at 4.2 V
  • Ultra micro 2.9 g weight with nylon gears and single bearing

Specifications

  • Application: Heli
  • Product Application: Air
  • Servo Size Category: Ultra Micro
  • Servo Type: Analog
  • Programmable: Yes
  • Motor Type: Brushed
  • Gear Type: Nylon
  • Bushing or Bearing: Bearing
  • Bearing: Single
  • Input/Operating Voltage: 3.2–4.2 V
  • Maximum Servo Speed: 0.065 @ 4.2 V
  • Maximum Servo Torque: 9.6 oz/in @ 4.2 V
  • Connector Type: JST-SHR 1.0 mm
  • Connector Wire Length: 4.52" (115 mm)
  • Servo Throw: 13.5 mm
  • Product Length: 0.9" (23 mm)
  • Product Width: 0.7" (18 mm)
  • Product Height: 0.4" (10 mm)
  • Product Weight: 0.10 oz (2.90 g)
  • Water-Resistant: No

Specifications

  • Performance linear long throw servo designed specifically for use with AS3X ultra micro aircraft
  • 13.5 mm servo throw
  • Compact footprint
  • JST-SHR Connector

H2040TL 2.9G Linear Servo Long Lead: UMX Timber X Specfications:

  • Application: Heli
  • Bearing: Single
  • Bushing Or Bearing: Bearing
  • Connector Type: JST-SHR 1.0 mm
  • Connector Wire Length: 4.52" (115 mm)
  • Gear Type: Nylon
  • Input Voltage: 3.2V-4.2V
  • Maximum Servo Speed: 0.065 @ 4.2V
  • Maximum Servo Torque: 9.6 oz/in @ 4.2V
  • Motor Type: Brushed
  • Part Type: Electronics
  • Product Application: Air
  • Product Height: 0.4" (10 mm)
  • Product Length: 0.9" (23 mm)
  • Product Weight: 0.10 oz (2.90 g)
  • Product Width: 0.7" (18 mm)
  • Programmable: Yes
  • Servo Operating Voltage: 3.2 - 4.2V
  • Servo Size Category: Ultra Micro
  • Servo Type: Analog
  • Water-Resistant: No



Key Info:
  • Brand: Spektrum
  • Part No: SPMSH2040TL
  • Barcode: 0605482155998
  • Fitment: Standard Part

Delivery & Returns

Standard Shipping

£3.95 to most of the UK

Express Shipping

£6.95 to most of the UK

Worldwide Shipping

Available at checkout

Customer Reviews

No specific product reviews yet, why not write one?
Write a Review
All reviews are subject to moderation

Questions & Answers

No questions yet, why not ask one?
Ask a Question
Get early access to deals and new arrivals.
Use this form to ask us a quick one sentence question about this specific product. Do not enter anything you would not like displayed on our site.

For more in depth queries, please contact us.